Collection 2320 - Oswald Berg, Jr. Architectural Drawings, 1952-1979
Creator: Berg, Oswald
Provenance Note: Architectural drawings and blueprints created by Oswald Berg, Jr. were accessioned by Special Collections on January 25, 1995.
Historical Note: Oswald Berg, Jr. was a Bozeman, Montana architect and son of a Megher County rancher. Berg attended Washington State College and served as an architect in the U.S. Navy during World War II. He began professional practice in Bozeman in 1949, doing business unitl 1983 under the corporate names of O. Berg Jr. and Associates, BGS Architects, and Berg-Grabow and Partners. Berg also served as president of the Bozeman Chamber of Commerce in 1969. He designed many buildings in Montana and neighboring states, including residences, schools, and businesses.
Content Description Note: The Berg drawings have been described as individual sets and assigned set numbers in the order of processing. Montana towns represented are Alder, Belgrade, Bozeman, Colstrip, Ennis, Fort Harrison, Gallatin Gateway, Glendive, Livingston, Phillipburg, Shelby, Sunburst, and Three Forks. Other locations are Cody, Mammoth, and Thermopolis, Wyoming, and Boardman, Oregon. The sets have been individually described.
Contents
ALDER, MT
Set #30Location: Alder, MT
Bldg.: Snowcrest Resident, Closs Ranch
Firm: Berg-Grabow-Schofield
Serial #: 7713
Date: 8/28/77
Documents: 9 sheets w/ cover
Medium: 16"x18" topographic with pencil; plastic sheets w/ pencil 18"x24"
Inventory: 1-11
BELGRADE, MT
Set #9Location: Belgrade, MT
Bldg.: Belgrade JR High School
Firm: O. Berg Jr. & Associates
Serial #: 4168
Date: 267
Documents: 32 sheets
- Inventory:
- 1 - plot plan
- 2 - foundation plan
- 3 - foundation plan & roof framing
- 4-6 - flr. plan
- 7 - door schedule
- 8 - finish schedule
- 9-10 - exterior elevations
- 11 - interior elevations
- 12 - interior elev. & section
- 13 - cross sections
- 14 - details
- 15 - wall details
- 16 - plot plan, elevations, details
- 17 - flr. & foundation plans, details & cross section
- 18 - wall section, details & elevations
- S1 - roof framing
- S2 - structural details
- M1 - flr. plan details
- M2 - foundation plan & details
- M3 - plan & details
- M4 - foundation plan & details
- M5 - basement plan & details
- M6 - boiler room plan & details
- M7 - schedules
- M8 - plans & details
- E1 - classroom wing - power & specialties
- E2 - classroom wing - lighting plan
- E3 - schedule, music & shop flr. plan, elementary classrm plan
- E4 - gymnasium basement remedial - electrical plan, PA system
- 2 - foundation plan
Set #28
Location: Belgrade, MT
Bldg.: Belgrade High School
Firm: O. Berg, Jr. & Associates
Serial #: 2361
Date: 9/14/62; 9/17/62; 11/6/62; 11/10/62 (fallout shelter); 5/21/63 (color sched.); 5/24/63 (plot plan)
Documents: 46 sheets
Medium: Pencil on 22"x34" sheets
- Inventory:
- M1, 2, 3, 3A, 4, 5, 6, 7 - ?
- venting hoods
- 1-15, A1-2, E1-5, S1-3 - ?
- FE1-2, M8-9, F1-6 - fallout shelter
- venting hoods
Set #38
Location: Belgrade, MT
Bldg.: Belgrade Public School
Firm: Oswald Berg, Jr.
Serial #: 1253
Date: 4/3/54, 12/21/54
Documents: 14 sheets
Medium: pencil on paper
Scale:
Size: 32"x42", 21"x30"
Set #47
Location: Belgrade, MT
Bldg.: Graff residence
Serial #: none
Date: not given
Documents: 1 sheet
Medium: pencil on plastic
Size: 16"x24"
BOZEMAN, MT
Set #1Location: Bozeman, MT
Bldg.: Mc Aulan residence (residence for Ms. Helen McAulan)
Firm: O. Berg, Jr. & Associates - Architects - Bozeman, MT
Serial #: 2065
Date: Feb 1966
Documents: 5 sheets (1 - pen & ink on trace paper/4 - on trace in pencil)
Medium: Pencil on trace paper (4), Ink on trace (1)
Scale: varies, 1"=20'-0"; "=1'-0"
Size: 9x15 (1); 22"x34" (4)
- Inventory:
- Sheet 1 - site plan, site details & specification
- Sheet 2 - basement, foundation, main flr. & roof framing plans
- Sheet 2a - Alterations on main flr.
- Sheet 3 - sections & elevators
- Sheet 6 - electrical & mechanical layout - fixture schedules
- Sheet 2 - basement, foundation, main flr. & roof framing plans
Set #5
Location: Bozeman, MT
Bldg.: Lair Ice Cream Parlor
Firm: Berg-Grabow-Schofield
Serial #: 7614
Date: August 1976
Documents: 16 sheets
- Inventory:
- cover sheet
- 1 - roof plan
- 2 - footing & foundation plan
- 3 - flr. plan & room finish schedule
- 4 - roof framing plan & structural detail
- 5 - bldg. sections, elevations & misc. detail
- 6 - wall sections & details
- M1 - H.V.A.C. plan
- M2 - plumbing plan
- M3 - site risers & pipe sleeve plan
- M4 - H.V.A.C. & plumbing specifications
- E1 - schedule
- E2 - lighting plan
- E3 - equipment schedule
- R1 - revisions: employ room, storage, elec. panel
- R2 - rough plan
- 1 - roof plan
Set #6
Location: Bozeman, MT
Bldg.: Taylor Tennis Court, Westridge Dr.
Firm: Berg-Grabow & Partners, Bozeman, MT
Serial #:
Date:
Documents: 6 sheets
- Inventory:
- 1 - elevations & sections
- 2 - rough drawing
- 3 - section
- 4 - section & elevations
- 5 - location
- 2 - rough drawing
Set #10
Location: Bozeman, MT
Bldg.: City Shops
Firm: Berg-Grabow & Partners
Serial #: 7406
Date: May 1974
Documents: 25 sheets
- preliminary site plan
- site plan
- P4 - wall sections
- flr. plan - shop bldg.
- AD1 - Mezzanine beam connection
- AD2 - revised (3) wall section
- 1 - site plan & details
- 2 - foundation plan & flr. slab plan
- 3 - foundation details & stair details
- 4 - flr. plan & schedule
- 5 - bldg. elevations & window details
- 6 - bldg. sections & wall details
- 7-8 - wall sections & details
- 9 - roof framing plan
- M1 - plot plan & fuel station details
- M2 - sewer system
- M3 - flr. plan - plumbing & air systems
- M4 - underflr. plan - heating & ventilation
- M5 - flr. plan - mechanical - heating & ventilation
- M6 - exhaust system - schedules & details
- M7 - details: hot & cold water, sewer, hydraulic hoist, lube system
- E1 - lighting flr. plan - fixture schedule
- E2 - power flr. plan - riser diagram
- E3 - electrical site plan - control equipment, panels
- site plan
Set #11
Location: Bozeman, MT
Bldg.: O. Berg office
Firm: Oswald Berg, Jr., Bozeman
Serial #: 3154
Date: 9/14/54
Documents: 9 sheets
- Inventory:
- 1 - specifications, plot plan, foundation plan
- 1A - plan & elevation
- 2 - flr. plan details
- 3 - elevation (E & N), door schedule
- 4 - elevation (S & W), glulams schedule
- 5 - cabinet detail
- 6 - plumbing, heating, electric
- 1 - office addition
- 2 - office details
- 1A - plan & elevation
Set #13
Location: Bozeman, MT
Bldg.: Museum of the Rockies
Firm: Berg-Grabow & Partners
Serial #: 6922, 7423, 7209
Date: Sept. 1971
Documents: 18 sheets
- Inventory:
- cover sheet
- 1.0 - site plan
- 2.0 - door, hardware, room finish schedule, door details
- 3.0 - footing & foundation plan details
- 3.0R - revised footing & foundation plan details
- 3.1 - 1st flr. & roof framing plans
- 3.2 - 1st flr. & basement
- 4.0 - elevations
- 5.0 - building sections
- 5.1 - cross sections details
- 6.0 - scupper, window & stair details
- ME1.0 - mechanical & electrical
- ME2.0 - mechanical plans & details
- ME3.0 - electrical plans
- corridor addition
- 1 - footing, foundation, basement & main flr. plans
- 2 - flr. & roof framing plan, roof plan & misc. details
- 3 - exterior elevations & misc. details
- 4 - wall sections & misc. sections
- #7209 S1 - bldgs. 1 & 2 - site plan
- S2 - bldg. 2
- 1.0 - site plan
Set #23
Location: Bozeman, MT
Bldg.: Lewis Hall, MSU, remodeling
Firm: Berg-Grabow & Partners
Serial #: 7403
Date: April 1974
Documents: 2 sheets
- Inventory:
- 1 - floor plan
- 2 - room elevations & millwork & detail
Set #24
Location: Bozeman, MT, Lot #9
Bldg.: Nelson residence
Firm: Berg-Grabow & Partners
Serial #: 7508
Date: Sept. 1975
Documents: 5 sheets
- Inventory:
- 1 - plot plan
- 2 - basement flr. plan, footing & found. plan & misc. detail
- 3 - sections - bldg., stair & wall
- 4 - exterior elev.
- 2 - basement flr. plan, footing & found. plan & misc. detail
Set #25
Location: Bozeman, MT
Bldg.: MSU Locker Room remodel
Firm: Berg-Grabow & Partners
Serial #: 7306
Date: Aug. 1973
Documents: 5 sheets
Set #27
Location: Bozeman, MT
Bldg.: Intermountain Forest & Range Experiment Station
Firm:
Serial #: 261
Date:
Documents:
Set #33
Location: Bozeman, MT
Bldg.: Bogart Park Pavilion
Firm: Berg-Grabow & Partners
Serial #: 7611
Date: 7/15/76, 8/76
Documents: 3 sheets
Medium: printed on plastic, pencil on paper
Size: 17"x22", 22"x34"
Inventory: S1-2 - paper
Set #35
Location: Bozeman, MT
Bldg.: Bozeman Daily Chronicle
Firm: Berg-Grabow & Partners
Serial #: 7404
Date: not given
Documents: 22 sheets
Medium: pencil on paper
Scale:
Size: 22"x34"
Set #36
Location: Bozeman, MT
Bldg.: 1st National Bank
Firm: Berg-Grabow & Partners
Serial #: 7302
Date: 6/73
Documents: 15 sheets
Medium: pencil on paper
Size: 22"x34"
Set #39
Location: Bozeman, MT
Bldg.: Bridger Bowl Chalet
Firm: O. Berg, Jr. & Associates
Serial #: 667
Date: 6/25/67, 7/3/67
Documents: 9 sheets
Medium: blue print
Scale:
Size: 22"x34"
Set #41
Location: Bozeman, MT
Bldg.: Senior High - Junior High Complex, phase II
Firm: Berg-Grabow & Partners
Serial #: 74-02 & 7402
Date: 4/74, 4/28/75, 6/7/75
Documents: 73 sheets
Medium: pencil on paper, plastic insert of bldg. on title page
Size: 22"x34"
Set #42
Location: Bozeman, MT
Bldg.: Bozeman Senior High/Jr. High Complex, Addition Phase I, Shop Bldg., Career Ctr.
Firm: Berg-Grabow & Partners
Serial #: 7115 HS, 7115 S
Date: 10/73, 1/74, 9/11/73, 8/10/73
Documents: 34 sheets
Medium: pencil on paper
Size: 22"x34"
Set #44
Location: Bozeman, MT
Bldg.: Dokken-Nelson Funeral Home
Firm: Berg-Grabow & Partners
Serial #: none
Date: 3/74
Documents: 1 sheet
Medium: pencil on paper
Size: 14"x26" mounted on 22"x34"
Set #20
Location: Bozeman, MT
Bldg.: Bridger Pines Condominiums # 1 & Lower Lift Terminal House
Firm: Berg-Grabow & Partners
Serial #: 7201
Date: Nov. 1972
Documents: 5 sheets
- Inventory:
- 1 - site plan
- 2 - floor plans
- 3 - elevations & sections
- 4 - details
- 1 -lower lift terminal house
- 2 - floor plans
COLSTRIP, MT
Set #14Location: Colstrip, MT
Bldg.: Shop Complex
Firm: Berg-Grabow & Partners
Serial #: 7309
Date: June 1974
Documents: 22 sheets
- Inventory:
- pump house revision
- 1 - water storage standpipe
- A4 - warehouse plan - welding shop
- A5 - crew change house flr. plan
- A6 - office flr. plan & schedules
- A7 - room elevations
- E1 - welding, pump house, crew change, office & grease bldg.
- S1 - flr. slab plans - office, crew & grease
- S2 - flr. slab plans - repairs & service shop warehouse & welding
- M1 - site plan
- M2 - plot plan
- M3 - office - plumbing
- M4 - office complex
- M5 - crew change - plumbing
- M6 - crew change - mechanical
- M7 - warehouse - mechanical & plumbing
- M9 - welding shop - plumbing & details
- M10 - welding shop - mechanical & details
- M11-M11A - repair & service shop - plumbing & details
- M12-M12A - repair & service shop - mechanical & details
- 1 - water storage standpipe
Set #34
Location: Colstrip, MT
Bldg.: Shop Complex, Coal Strip Mines
Firm: Berg-Grabow & Partners
Serial #: 7309
Date: 2/73, 6/74, 6/73, 8/73, 11/74, 10/26/73, 10/10/72, 12/6/73
Documents: 27 sheets
Medium: pencil on paper, plastic print
Size: 22"x36", 22"x34", 24"x36", 24"x18"
- Inventory:
- title page w/ plastic print of buffalo silhouette
- water storage stand pine & pump house revision
- lagoon profile (11/74)
- electric unit heater schedule
- 2A - blue print
- unit train coal handling facility - plot plan (10/10/72)
- blue print - site plan (12/6/73)
- water storage stand pine & pump house revision
ENNIS, MT
Set #4Location: Ennis, MT
Bldg.: Elementary School addition
Firm: Berg-Grabow-Schofield, Walter Arnold, Architects, Butte, MT
Serial #: 7532
Date: June 1976 & May 3, 1952
Documents: 26 sheets
- Inventory:
- 1 - plot plan
- 2 - ground flr. plan
- 3 - 1st flr. plan - schedules
- 4 - roof framing plan - rm. elevation
- 5 - elevations
- 6 - sections
- 7 - details
- M1 - mechanical-boiler room - detail
- M2 - mechanical - schedules
- M3 - Mechanical details
- P1 - plot plan - plumbing - details
- P2 - plumbing - ground flr. plan
- P3 - plumbing - 1st flr. plan
- P4 - plumbing - piping diagram
- E1-E3 - electrical
- 2 - ground flr. plan
- 5/3/52
- 1 - foundation & basement plan
- 2 - 1st flr. plan
- 3 - root plan
- 4 - elevation
- 5 - sections & elevat.
- 6-8 - detail
- 2 - 1st flr. plan
FORT HARRISON, MT
Set #8Location: Ft. Harrison, MT
Bldg.: Ft. Harrison National Guard Armory
Firm: Berg-Grabow & Partners
Serial #: 6912
Date: May 1970
Documents: 25 sheets
- Inventory:
- 1 - photograph of plot plan
- 2 - footing & foundation plan
- 3-3A - 1st flr. plan
- 4-4A - 2nd flr. plan
- 5 - roof framing plan
- 6-6A - elevations
- 7 - sections
- 8-8A - wall sections & details
- 9 - entry stair details & wall sections
- 10-10A - elevations & details
- M1 - utility plot plan
- M2 - roof plan mechanical
- M3 - plumbing & heating, footing & foundation plan
- M4 - 1st flr. plan - heating & ventilation
- M5 - 1st flr. plumbing plan
- M6 - 2nd flr. mechanical & enlarged plumbing plan
- M7 - schedules & details - mechanical
- E1 - 1st flr. - electrical power & lighting
- E2 - plot plan & 2nd flr. plan
- 2 - footing & foundation plan
GALLATIN GATEWAY, MT
Set #32Location: Gallatin Gateway, MT
Bldg.: Norem residence (Mr. & Mrs. Don Norem)
Firm: Berg-Grabow-Schofield
Serial #: 7717
Date: no date
Documents: 4 sheets
Medium: printed plastic sheets
Size: 24"x36"
Inventory:
GLENDIVE, MT
Set #2Location: Glendive, MT
Bldg.: 1st Nat'l Bank of Glendive
Firm: Oswald Berg, Jr. - Bozeman, MT
Serial #: 1759, 7610,7817, 2241 (3/15/62)
Date: 1-11-66, 4/8/65, 6/12/79
Documents: 59 sheets
Scale: varies, 1"=10', "-1'-0", "=1'-0", 1"=1', "=1', "-1'-0", "=1'-0"
Size: 26x36 (29), 24x35 (5), 18x24 (20), 36 x24 (1), 21x33 14/16 (1)
- Inventory:
- Sheet 1 - plot plan
- Sheet 2 - basement plan
- Sheet 3 - 1st flr. plan
- Sheet 3A - 1st flr. plan
- Sheet 4 - schedules
- Sheet 5 - elevation
- Sheet 6 - cross sections
- Sheet 7 - typical wall sections
- Sheet 8 - ceiling plans
- Sheet 9 - details
- S1 - basement foundation plan
- S3 - root framing plan
- S4 - sections
- S5 - sections
- S6 - sections
- R1 - basement cabinet details (1-11-66)
- R2 - revisions 1# (4-8-65)
- R3 - revisions 1# (4-8-65, different from R-Z)
- S7 - sections & details
- S8 - Concrete beam details
- M1 - plot plan schedules
- M2 - 1st flr. heat & vent.
- M3 - basement heat & vent.
- M4 - basement plan (plumbers)
- M5 - 1st reflected ceiling plan
- M6 - basement reflected ceiling plan
- M7-8 - details
- M9-10 - revisions
- E1 - plot plan, electrical
- E2 - basement flr. plan, electrical
- E3 - 1st flr. plan, electrical
- #7817 cover sheet - additions to the 1st Nat'l Bank of Glendive
- Sheet 1-10 - additions to officers area & drive in
- M1-M5 - same as above
- E1-E4 - same as above
- #2241 1 - drive up window
- #7610 1 - plot plan & details
- 2 - basement & foundation plan - details
- 3 - 1st flr. plan & details
- 4 - sections & details
- 5 - canopy framing plan & details
- Sheet 2 - basement plan
HELENA, MT
Set #19Location: Helena, MT
Bldg.: State Publishing Bldg. - Restor. & Remod.
Firm: BGS Architects
Serial #: 7709
Date: 7/78
Documents: 58 sheets (including photos)
- Inventory:
- 1 - site plan
- 2 - S. facade (elevations)
- 3 - N. evaluation
- 4 - N. & W. facades (restoration)
- 5 - restoration details - W. & S. facades
- 6 - D.H. Window details architrave, capital & balcony details
- 7 - elevations & stair details
- 9 - exist. ground flr. plan & renov. ground flr. plan
- 10 - exist. 1st flr. plan & renov. 1st flr. plan (Phase 1,2,3)
- 11 - 2nd flr.
- 12 - 3rd flr., loft
- 13 - 2nd & 3rd flr. - finish schedule
- S1-S2 - framing plan
- S3 - structural renovation
- S4-S5 - details
- M1-M6 - Phase II - bldg. remodel
- M7-M11 - Phase III - bldg. remodel
- schedules
- E1 - gr. flr. demol.
- E2 - 1st & gr. flr. - elec.
- E3 - 2nd flr. - elec.
- E4 - 3rd flr. - elec.
- E5-14 - bldg., remodel
- sections & details
- A - water supply - gr. & 1st flr.
- B - water supply - 2nd flr.
- C - water supply - 3rd flr.
- D - composite of M3 & M8
- E - schedules - composite of M4 & M9
- F - heating & ventilation
- g - schedules & details
- photo 1 - bldg.
- photo 2 - W. facade
- photo 3 - S. facade - center & E. entrance
- photo 4 - earliest picture
- 2 - S. facade (elevations)
LIVINGSTON, MT
Set #29Location: Livingston, MT
Bldg.: Studi - Built Homes, Inc.
Firm: BGS (Berg-Grabow-Schofield)
Serial #: 7515
Date: 8/8/75
Documents: 6 sheets
Medium: pencil on 18"x24" sheets
Inventory: 1-5 - waste & vent pipe diagram
Set #37
Location: Livingston, MT
Bldg.: Winama School - addition & renovation
Firm: Oswald Berg, Jr. Berg-Grabow & Partners
Serial #: 952A 7621
Date: 1/17/53 9/76
Documents: 1 sheet 2 sheets
Medium: pencil on paper; printed on paper
Size: 21"x30" 22"x34"
Set #43
Location: Livingston, MT
Bldg.: Livingston Memorial Hospital Additions
Firm: Berg-Grabow & Partners
Serial #: 7001
Date: 4/72, 7/72
Documents: 20 sheets
Medium: pencil on paper, colored marker on paper
Size: 22"x34", 24"x36"
PHILLIPBURG, MT
Set #12Location: Philipburg, MT
Bldg.: Philipburg Gym
Firm: Oswald Berg, Jr., Bozeman
Serial #: 555
Date: 3/6/56
Documents: 22 sheets
- Inventory:
- 1 - plot plan
- 2 - foundation plan
- 3 - 1st flr. plan
- 4-5 - elevations
- 6 - room & door schedule
- 7 - sections
- 8 - kitchen sections
- 9 - section, trim schedule
- 10 - sections
- 11 - stair sections
- 12-13 - wall sections
- 14 - door details & lockers
- 15-16 - cabinet details
- M1 - basement plumbing
- M2 - 1st flr. plumbing
- M3 - basement heating
- M4 - basement plumbing
- E1 - basement electrical
- E2 - 1st flr. electrical
- 2 - foundation plan
SHELBY, MT
Set #18Location: Shelby, MT
Bldg.: Toole Co. Courthouse & renovation
Firm: BGS Architects & McIver & Cohogen (Billings & Great Falls)
Serial #: 7815, 276
Date: May 1979, 7/14/34
Documents: 36 sheets
- Inventory:
- cover page
- 1 - ground flr. plan
- 2 - 1st flr. plan
- 3 - 2nd flr. plan
- 4A - room finish sched.
- 4B - room finish sched. - 2nd flr. plan
- 4C - schedules
- 5 - elevations
- 6 - court room details
- 7 - court room details & misc.
- 8-9 - entry 1
- 10 - 3rd flr. library
- 11 - library details
- 12 - stairs details
- 14 - 1st flr. plan
- M1 - 2nd & 3rd flr. mech. demo plan
- M2 - ground flr. mech. plan
- M3 - 2nd & 3rd flr. mech. plan
- M4 - sections
- M5 - schedules
- E1 - ground flr. elec. plan
- E2 - 1st flr. elec. plan
- E3 - 2nd flr. lighting plan
- E4 - 2nd flr. power & sp. syst. plan
- E5 - 2nd flr. elec. demo plan
- E6 - enlarged boiler rm., 3rd flr. elec. plan
- E7 - diagrams & schedule
- 1 - approach plan
- 2 - gr. & 1st flr. plan
- 3 - roof & 2nd flr. plan
- 4 - elevations
- 5-6 - details
- 7 - footing & gr. flr. plan, 1st flr. framing
- 8 - 2nd flr. & roof framing plan
- 1 - ground flr. plan
SUNBURST, MT
Set #31Location: Sunburst, MT
Bldg.: Toole Co. Library
Firm: Berg-Grabow-Schofield
Serial #: 7627
Date: 1/13/77
Documents: 10
Medium: plastic sheet, printed
Size: varies, 25"x36"; 18"x24"; 24"x30"; 24"x36"
Inventory: 1-5; M1; E1 - arch. drawing of bldg., site & elev. plan, topo map
THREE FORKS, MT
Set #40Location: Three Forks, MT
Bldg.: Three Forks High School Addition
Firm: James Calloway Teague Berg-Grabow & Partners
Serial #: none 6809
Date: 6/15/1916 3/69
Documents: 9 sheets 35 sheets
Medium: blue print printed on clear plastic
Size: 15"x20" 8"x10", 14"x11", 14"x17"
Set #22
Location: Three Forks, MT
Bldg.: Gymnasium Addition - storage room
Firm: Berg-Grabow & Partners
Serial #: 7501
Date: March 1975
Documents: 5 sheets
- Inventory:
- preliminary take-off
- N. elev. & flr. plan (2)
- 1 - floor plan, elev., section & framing plans
- 2 - details, section & electrical plan
- N. elev. & flr. plan (2)
Collection #26
Location: Three Forks, MT
Bldg.: Three Forks High School
Firm:
Serial #: 6809
Date:
Documents:
NON-MONTANA AND UNIDENTIFIED
Set #15Location: Cody, WY
Bldg.: 1st State Bank
Firm: Berg & Tresler Associate Ar.
Serial #: 563
Date: Jan. 22, 1964
Documents: 20 sheets
- Inventory:
- S1 - structural
- 1 - plot plan
- 2 - basement flr. plan
- 3 - 1st flr. plan
- 4 - schedules
- 5 - elevations
- 6 - section
- 7 - interior elevations
- 8-10 - details
- 11 - coupon booths & teller units
- M1-M2 - basement plan
- M3 - 1st flr. plan
- M4 - details
- E1 - basement & plot plan - electrical
- E2 - 1st flr. plan - electrical
- E3 - schedules & details - electrical
- 1 - plot plan
Set #16
Location: Cody, WY
Bldg.: 1st Wyoming Bank - Renovations & Additions
Firm: BGS Architects, 1119 N. 7th
Serial #: 7813
Date: 7-16-79
- Inventory:
- cover sheet
- 1 - site plan
- 2 - site details
- 3 - flr. plan & schedules
- 4 - walk up teller details
- 5 - wall sections & teller center
- 6 - loan counter details, night depository & cash vault details
- 7 - elevations & details
- 8 - cabinets & details
- 9 - drive-up canopy
- 10 - drive-up canopy details, sidewalk trellis
- 11 - snow removal shed
- M1 - 1st flr. demo
- M2 - 1st flr. mechanical
- M3 - basement flr. plan
- M4-M6 - specifications
- E1 - basement & site plan
- E2 - 1st flr. demo
- E3 - 1st flr. plan
- E4 - legend & specs, map showing building location for 1st State Bank
- 1 - site plan
Set #3
Location: Mammoth, WY
Bldg.: Mammoth Elementary School
Firm: Berg
Serial #: 7722
Date: 12/30/77
Documents: 22 sheets
- Inventory:
- A1 - 1st flr. plan, 2nd flr. plan, roof framing plan, footing foundation plan, & plot plan
- A2 - North, East, & West elevations
- 3 - 1st & 2nd flr. plan - electrical & mechanical, site plan
- 1 - cover sheet - map of YNP
- 2886C - entrances
- 440 - cross sections
- 1 - plot plan
- 3 - basement & foundation plan
- 4 - flr. plan
- 5 - room finish schedule
- 6 - exterior elev. & cabinet details
- 7 - sections & interior elevators
- 8 - interior elev. & cabinet details
- 9 - multipurpose room details
- 10 - classroom details
- 11 - roof framing plan & structural details
- 12 - electrical flr. plan, legend schedules, transformer details
- 13 - special services flr. plan, panels riser diagram
- 14-17 - mechanical
- A2 - North, East, & West elevations
Set #7
Location: Thermopolis, Hot Springs Co., WY
Bldg.: 1st State Bank of Thermopolis
Firm: BGS Architects, Bozeman, MT
Serial #: 7818
Date: April 6, 1979
Documents: 26 sheets
- Inventory:
- cover page
- S1 - post sections
- A1 - basement flr. plan
- A2 - 1st flr. plan
- A3 - section
- A4 - roof framing plan
- A5 - elevation (N & S)
- A6 - elevation (W & E)
- A7 - elevation & section
- A8 - section
- A9 - details
- A10 - sections & elevations
- A11 - details
- A12 - schedules
- A13 - revision - July 1979
- A14 - drive-up window
- A15 - night depository
- A16 - cabinet details
- site plan
- M1 - basement flr. plan
- M2 - 1st flr. plan
- M3 - mechanical legend, schedules & section
- P1 - site plan
- P2 - basement flr. plan (BFP)
- E1 - BFP - power & telephone
- E2 - BFP - lighting
- E3 - site plan & 1st flr. - power
- E4 - 1st flr. plan - lighting
- E5 - schedules
- S1 - post sections
Set #21
Location: Boardman, OR 97818
Bldg.: Kyd residence (Mr. & Mrs. Charles R. Kyd)
Firm: Berg-Grabow-Schofield
Serial #: 7615
Date: 1-78
Documents: 11 sheets
- Inventory:
- 1 - footing & found. plan
- 2 - 1st flr. plan
- 3 - roof framing plan
- 4 - cross sections & elevations
- 5 - sections & details
- 6 - wall sections & details
- 7 - details & schedules
- 8 - plot plan & details
- P1 - found. plumbing plan
- E1 - electrical plan
- footing & found. plan
- 2 - 1st flr. plan
Set #17
Location:
Bldg.: Office Bldg. Addition (Assoc. P&C Engineers, Inc.)
Firm: Berg-Grabow & Partners
Serial #: 7312
Date: Nov. 10, 1973
Documents: 13 sheets
- Inventory:
- A1 - plot plan & details
- A1.1 - details & revisions
- A2 - structural plan & details, footing foundation plan & details
- A3 - ground flr. plan
- A4 - 1st flr. plan
- A5 - door hardware schedule & details
- A5.1 - room finish schedule
- A6 - bldg. elevations
- A7 - bldg. & stair sections
- A8 - entry sections & details
- A9 - wall sections
- A10 - interior room elevations
- A11 - reflected ceiling plans
- A1.1 - details & revisions
Set #45
Bldg.: City Center Motel, remodel
Serial #: 7507
Date: not given
Documents: 2 sheets
Medium: pencil on paper
Size: 22"x34"
Set #46
Bldg.: 1st Nat'l Bank, alternations & additions
Serial #: 6921
Date: 7/70
Documents: 2 sheets
Medium: printed on clear plastic
Size: 11"x17"